How fast does quick drying floor screed dry?
Standard floor screed dries at a normal rate of 1mm per day, up to 40mm and 0.5mm per day, thereafter. This would typically mean that an average 75mm screed application would take around 110 days to dry at a temperature of 20 degrees.
Fast drying floor screed, thanks to its additives, typically dries within hours of being laid. There really is no better option when you are looking for quick drying times.
Download our data sheets for more information:
Fast drying screed benefits
Extremely reduced drying times to enable the application of final floor finishes
Fast drying screed for usage where high point loading or heavy traffic can be expected
Quicker early strength development
Reduced drying shrinkage resulting from low water/cement ratio
Estimated light foot traffic as early as 4 hours (depending on requirements, we can provide different versions of fast drying screeds)
Improved working properties providing a much easier and more reliable compaction
Conforms to the requirements of BS EN 13813
Is Fast Drying Screed Ideal For Commercial Projects?
Our fast drying screed is the ideal solution for commercial products where weeks of downtime just isn’t an option. From shopfloors to workshops, our fast drying screed is ready for light footfall in a matter of days. We can give you advice on the best type of screed to use for your application and advise you on drying times.
We can also supply our fast drying screed to areas where heavy foot traffic is a given, such as airport terminals, arenas, stadiums and hospitals. Speak to our specialists today to find out more about our solutions and how we can help you to create durable flooring solutions that give many years of dependable performance.
Consists of a semi-dry mixture of sand and cement with the addition of additive to reduce the water content to allow for the early application of floor finishes. Dependant on the requirements, the type of material can provide for traffic between 4-24 hours and application of finishes between 1 day to 4 weeks. All in accordance with the British Standards.
Supply – delivered to site ready mixed or prepared on site.
Installation and thickness
Bonded: 15-40 mm
Partially bonded: 40-150mm
Un-bonded: 50-150mm
Floating: 65-150mm
Compatibility: Acceptable for use with underfloor heating
Site traffic: 4–24 hours product dependant
Drying time: 4 hours–4 weeks product dependant
Installation capacity: Up to 200m2 per gang per day